Energy from Waste Power plant of 40 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Photovoltaic Plant of 30 MWp. Development and promotion (permitting), conceptual design and basic engineering of the PV plant
Gas Turbine Combined Cycle Power Plant in 5x1 configuration. Basic engineering and main equipment procurement.
Energy from Waste Power plant of 45 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Hybrid Gas Turbine and Photovoltaic Power Plant.Conceptual design, basic engineering and technical coordination during EPC tender stage.
Performance remote monitoring of the Huelva and Puertollano 50 MW biomass power plants.
Biomass power plant 50 MW. Independent engineer for the audit of the power plant performance tests.
Energy from Waste Power plant of 45 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Energy alternatives consulting (PV, engines and gas) for the 300,000 m3/day Al-Ghubrah III desalination plant.
Photovoltaic Plants of 50 MWp and 25 MWp. Complete development and promotion (permitting), conceptual design and basic engineering of the PV plant
Energy from Waste Power plant of 35 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Conceptual and basic engineering coordination and direction during tender stage. Medium and low voltage systems engineering.
Correction curves development for performance test in a conversion to combined cycle from a gas turbine open cycle power plant.
Design and engineering during tender stage for several combined cycle configurations, different power ranges for several owners and locations in Brazil.
Photovoltaic Plant of 15 MWp. Complete development and promotion (permitting), conceptual design and basic engineering of the PV plant
Energy from Waste Power plant of 80 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Hybridization analysis of a 50 MWe thermosolar CSP power plant with biomass combustion boiler
30 MW Biomass power plant in Ivory Coast. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Energy from Waste Power plant of 12 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Thermal Power Plant of 135 MW consuming Coke Oven Gas from a steelworks. Conceptual design and basic engineering during EPC tender stage.
Design Review and Stress Analysis for Molten Salt System piping’s. Piping and Welding break cause identification and new design for the identified solution.
Combined cycle power plant 600 MW. Conceptual design and Technical advisory during the development stage.
Waste to Energy Power plant 50 MW. Conceptual design, basic engineering and technical coordination during EPC tender stage.
Combined cycle cogeneration power plant 140 MW. Conceptual design and basic engineering during EPC tender stage.
Biomass Plant 50 MW. Owner’s engineering during the design and construction of the power plant.
Combined cycle power plant 600 MW. Conceptual design and basic engineering during EPC tender stage.
Cogeneration Biomass Plant. Technical advisory during the tender stage and EPC offer review.
Combined cycle power plant 2x400 MW. Basic engineering during EPC tender stage: Mechanical BOP Design.
Photovoltaic Plant 50 MW. Technical advisory during the development and transaction stage.
Combined cycle power plants 750 MW. Conceptual design and basic engineering during EPC tender stage.
Cogeneration plant 100 MW. Value engineering on the configuration and redundancy of main equipment, optimization of the general lay out and technical specification for purchase of the boilers and steam turbines.
Combined cycle power plant 2500 MW. Analysis, consistency calculation and reporting for the performance guarantee.
Open Cycle Power Plants 300 MW. EPC technical Proposal review and calculation of plant performance guarantees.
Combined cycle power plant 1200 MW. Conceptual design and basic engineering during EPC tender stage.
Combined cycle power plant 2500 MW. Study of off-boundaries systems: natural gas supply and raw water collection system.
Thermal Power Plant of 190 MW consuming coke oven gas from a steelworks. Conceptual design and basic engineering during EPC tender stage.